Migrating from Legacy Resource Estimates to Resource Budgeting

***

 

Deprecating the Legacy Resource Management Tools

Currently, you can manage the allocation of your resources on a project in two separate sections of the Business Case. The sections are independent from one another:

  • Legacy Resource Estimates 
    This information also populates the Capacity Planner at the system level.
  • Resource Budgeting
    This information also populates the Resource Planner at the system level.

For more information about the differences in functionality between the two sections, see "Understanding the Difference between Legacy Resource Planning and Planning."

The Legacy Resource Estimates section of the Business Case and all the features available at the system level in the Legacy Resource Planning tab are currently deprecated, and will soon be removed from Workfront.

For this reason, we recommend using the Resource Budgeting section of the Business Case to manage your resources for the project and the Resource Planner to manage your resources system-wide.

If you have existing resource budgeting information in the Legacy Resource Estimates section of the Business Case (and in the Capacity Planner), you must duplicate it in the new Resource Budgeting area (and in the Resource Planner) to continue to budget your resources in the newly supported tools. 

If you want to start using the Resource Budgeting section of the Business Case (and the Resource Planner) with new data, you can start doing so without duplicating any information from the Legacy Resource Estimates (and Capacity Planner) sections.

Understanding the Difference Between the Legacy and New Resource Management Tools

The main difference between the Legacy Resource Estimates and the Resource Budgeting sections of the Business Case on a project is that one uses Role-based Legacy Resource Pools, whereas the other uses User-based Resource Pools to manage resources. Because of this, budgeting resources is done differently in the two tools.

For more information about differences between the legacy and the new Resource Management tools, see “Understanding the Difference between Legacy Resource Planning and Planning.”

For information about the new Resource Pools, see “Working with Resource Pools.”

Migrating Your Existing Information

To be ready for the removal of the Legacy Management tools, and if you want to preserve the existing data from the Legacy Resource Estimates section of the project (and the Capacity Planner),  you must duplicate the information you now have in these tools and recreate it in the new Resource Management tools.

NOTE This refers to existing data only. If you want to start budgeting your resources today with new data, you can start using the Resource Planner without duplicating any existing information today.

If you want to preserve historical data, you can manually duplicate the information.
The following plan outlines the steps that you have to take, as a Resource Manager, to ensure that the budgeting information from the Legacy Resource Estimates section of a project (or the Capacity Planner, system-wide) is duplicated in the Resource Budgeting section of the same project (or the Resource Planner, system-wide).

When the two sections match, you can ensure that you are not missing any budgeting information for your resources in the new Resource Management tools and you may then start using these tools to budget the resources of your projects going forward.

NOTE We are working on automating the migration of your existing data, and we will keep you updated when that becomes available. 

Duplicating the Resource Budgeting Information in the Business Case

You must complete the following steps to manually duplicate the resource budgeting information from the Legacy Resource Estimates section to the new Resource Budgeting section on the Business Case of a project.

When you complete this workflow, you should be ready to use the new Resource Management tools in Workfront going forward:

  1. Align Roles. Ensure that the roles associated with the Legacy Resource Pools are also associated with the users in the new Resource Pools.  For information about comparing the roles between the Legacy Resource Pools and the ones associated with the users in the new Resource Pools see the “Matching Job Roles between Legacy Resource Pools and new Resource Pools” section in this article.
  2. Verify Users' Role Association. Ensure that your users are associated with at least one Job Role. If a user is associated with more than one role, ensure that you have a valid percentage for the users’ FTE for each role.
    For information about associating users with job roles and updating the percentage of FTE for each role, see "Editing User Accounts."
  3. Create New Resource Pools. Ensure that your users are organized in Resource Pools. Ideally, after running the reports referenced in step #1, populate your new Resource Pools with the users who can fulfill the job roles that your Legacy Resource Pools contained.
    For more information about populating Resource Pools with Users, see  "Associating Pools with Users."
    NOTE You do not need to create one new pool for every old pool that existed. You only need to ensure that the new Resource Pools that you are creating and associating with your projects contain users who can fulfill the same roles that belonged to the Legacy Resource Pools. You can attach several Resource Pools to the same project when you use the new Resource Management tools.
  4. Associate New Pools to Projects. Ensure that your projects have Resource Pools assigned to them. Ideally, after learning the information you need from following step #1, you would associate each project with a new Resource Pool (or several) that have users who can fulfill the job roles associated with the Legacy Resource Pools of the project.
    For information about how to associate Resource Pools with projects, see  "Associating Pools with Projects."
  5. Assign a Resource Manager. Ensure that you are the Resource Manager of the projects you want to budget your resources for.
    For information about designating Resource Managers, see "
    Designate Resource Managers for a Project."
  6. Verify Cost per Hour for Roles. If you are calculating Budgeted Cost, or Budgeted Labor Cost for your projects, ensure that the job roles associated with the users in your Resource Pools have Cost per Hour rates defined
    For information about creating Job Roles, see 
    "Creating and Managing Roles."
    NOTE If you are currently observing Budgeted Cost and Budgeted Labor Cost in the Legacy Resource Estimates section, these should already be in place.
  7. Review Prerequisites. For a full list of prerequisites that must be met before starting planning your resources in the Resource Budgeting section of the project, or in the Resource Planner, see "Understanding Prerequisites for Resource Planning."

Budgeting Resources in the New Resource Management Tools

We are going to assume that your resources have been previously budgeted in the Legacy Resource Estimates section of the projects where you are a Resource Manager and that information is up to date.

To budget your resources in the new Resource Management tools, do either of the following:

Budget Resources at the Project Level

    1. Go to one project on which you want to match the Legacy Resource Estimates section and the Resource Budgeting section in the Business Case.
    2. Click Edit Resource Budgeting, then Apply to select the appropriate Resource Pools.
    3. This displays your Resource Budgeting section for the project.
    4. You can expand each project to see all the Job Roles associated with the project, and each Job Role to see the users associated with each role.
    5. Using the BDG column, manually estimate the budget for each of your resources (for each User, or for each Job Role).
      IMPORTANT Ensure that the Budgeted Hours match the Estimated Hours from the Legacy Resource Estimates section for the same project and for the same role.
      Or
      (Optional) For a fast way to assign Budgeted Hours, use the Options drop-down menu from the project line, then select Set Roles’ Planned Hours as Budgeted to match the Planned Hours to the Budgeted Hours for each Job Role.
      This applies the Planned Hours from the time periods you see on the screen to the Budgeted Hours columns for each role and for the project. If there are time periods with Planned Hours that are not displayed on the screen, you must scroll from left to right and use the Set Roles’ Planned Hours as Budgeted option to match Planned Hours to the Budgeted Hours for all the time periods for the life of the project.
      IMPORTANT We recommend this only when your Planned Hours will match your Budgeted Hours for the Job Roles.
    6. Click Save.

Budget Resources at the System Level, Across Multiple Projects 

    1. Navigate to the Resource Planner.
    2. Select the Project View.
    3. (Optional) Use the filters to display only the projects you want to budget resources for.
    4. Using the BDG column, manually estimate the budget for each of your resources (for each User, or for each Job Role) under each project.
      IMPORTANT Ensure that the Budgeted Hours match the Estimated Hours from the Capacity Planner for the same projects and for the same roles.
      Or
      (Optional) For a fast way to assign Budgeted Hours, use the Options drop-down menu from the project line, then select Set Roles’ Planned Hours as Budgeted to match the Planned Hours to the Budgeted Hours for each Job Role.  This applies the Planned Hours from the time periods you see on the screen to the Budgeted Hours columns for each role and for the projects. If there are time periods with Planned Hours that are not displayed on the screen, you must scroll from left to right and use the Set Roles’ Planned Hours as Budgeted option to match Planned Hours to the Budgeted Hours for all the time periods for the life of the projects.
      IMPORTANT We recommend this only when your Planned Hours will match your Budgeted Hours for the Job Roles.
    5. Click Save.

Matching Information Between the Legacy and the New Resource Management Tools

  1. Go to the Business Case of each project, and compare all of the following fields between the Legacy Resource Estimates and the Resource Budgeting sections and ensure they match:
    1. The Hours column (for each Job Role) in the Legacy Resource Estimates section must match the Hours column in the Resource Budgeting section.
    2. The Legacy Resource Estimates (currency field) column must match the Budgeted Labor Cost column for each Job Role.
    3. The overall cost for the Legacy Budgeted Cost (next to the Legacy Resource Estimates section) and the overall cost for the Budgeted Labor Cost (next to the Resource Budgeting section) must match.
  2. If all the fields in step #1 match, your Legacy Resource Estimates information is now duplicated in the Resource Budgeting section of the Business Case.
  3. You are now ready to use the Resource Budgeting section of the Business Case and the Resource Planner as your Resource Management tools in Workfront.
  4. Repeat the process described in this article for all the projects whose resources you want to budget using the new tools.
  5. If some of the fields do not match, start the process from the beginning and ensure all your prerequisites are met for managing your resources in the Resource Budgeting section.

Matching Job Roles Between Legacy Resource Pools and New Resource Pools

There are various ways to ensure that the Job Roles in your Legacy Resource Pools will also be associated with the users in your new Resource Pools.

In the following section, we are outlining one of these ways.

To ensure that the Job Roles that are associated with the Legacy Resource Pools are also associated with the users in the new Resource Pools, you can build two reports and visually compare the data between them.

Do the following, in the following order: 

  1. Build a Project Report with Legacy Pools and Job Roles Information
  2. Build a Resource Pool Report with Users’ Job Roles Information
  3. Compare the Two Reports and Update the Projects with the New Resource Pools

Build a Project Report with Legacy Pools and Job Roles Information

You can build the following Project report to identify the Legacy Resource Pools associated with your projects and which Job Roles are associated with those pools. The report also displays the new Resource Pools associated with the projects, if there are any:

  1. Navigate to Reporting.
  2. Select the Reports tab.
  3. Click New Report.
  4. Select Project.
  5. On the Columns (View) tab, click the header of each column to select it, then remove all columns except for one.
  6. Click the header of the column that is left, then click Switch to Text Mode.
  7. Click to edit text.
  8. Remove the text in the text mode builder, and replace it with the following:
    column.0.descriptionkey=name
    column.0.link.linkproperty.0.name=ID
    column.0.link.linkproperty.0.valuefield=ID
    column.0.link.linkproperty.0.valueformat=int
    column.0.link.lookup=link.view
    column.0.link.valuefield=objCode
    column.0.link.valueformat=val
    column.0.linkedname=direct
    column.0.listsort=string(name)
    column.0.namekey=name.abbr
    column.0.querysort=name
    column.0.section=0
    column.0.shortview=false
    column.0.stretch=100
    column.0.valuefield=name
    column.0.valueformat=HTML
    column.0.width=200
    column.1.displayname=Legacy Resource Pools
    column.1.linkedname=resourcePool
    column.1.namekey=view.relatedcolumn
    column.1.namekeyargkey.0=resourcePool
    column.1.namekeyargkey.1=name
    column.1.querysort=resourcePool:name
    column.1.valuefield=resourcePool:name
    column.1.valueformat=HTML
    column.2.displayname=Job Roles in Legacy Pools
    column.2.listdelimiter=<br>
    column.2.listmethod=nested(resourcePool.roles).lists
    column.2.textmode=true
    column.2.type=iterate
    column.2.valueexpression={name}
    column.2.valueformat=HTML
    column.3.displayname=
    column.3.linkedname=direct
    column.3.namekey=resourcepools
    column.3.tile.name=component.resourcepoollist
    column.3.valuefield=resourcePoolListString
    column.3.valueformat=HTML
    column.3.viewalias=resourcepools
    project_with_legacy_pools_and_new_pools_text_mode_report.png
  9. (Optional) Select the Filters tab and filter for only the projects that you want to manage resources for.
  10. Click Save + Close.
  11. This report also includes information about the new Resource Pools associated with the projects, if any.

Build a Resource Pool Report with Users’ Job Roles Information

You can build a Resource Pool report to identify which users are associated with Resource Pools and what Job Role each user is associated with.

NOTE This report only shows the Primary Job Role of the users in the Resource Pools. You cannot show the Other Roles in a report like this.

To build the report:

  1. Navigate to Reporting.
  2. Select the Reports tab.
  3. Click New Report.
  4. Select Resource Pool.
  5. On the Columns (View) tab, click the header of each column to select it, then remove all columns except for one.
  6. Click the header of the column that is left, then click Switch to Text Mode.
  7. Click to edit text.
  8. Remove the text in the text mode builder, and replace it with the following:
    column.0.descriptionkey=name
    column.0.link.linkproperty.0.name=ID
    column.0.link.linkproperty.0.valuefield=ID
    column.0.link.linkproperty.0.valueformat=val
    column.0.link.lookup=link.view
    column.0.link.value=val(objCode)
    column.0.listsort=string(name)
    column.0.namekey=name
    column.0.querysort=name
    column.0.stretch=20
    column.0.valuefield=name
    column.0.valueformat=HTML
    column.0.width=100
    column.1.valueexpression=CONCAT({name},'-',{role}.{name})
    column.1.listdelimiter=<br>
    column.1.listmethod=nested(users).lists
    column.1.valueformat=HTML
    column.1.displayname=Users in the Resource Pool and their Primary Roles
    column.1.textmode=true
    column.1.type=iterate

    new_resource_pools_with_users_and_their_primary_roles_text_mode_report.png

    NOTE Take this opportunity to assign Job Roles to users who are missing them, if you want to include them in Resource Pools. 
  9. (Optional) Select the Filters tab and filter for only the Resource Pools that you plan associating with the projects whose resources you want to manage.
  10. Click Save + Close.

Compare the Two Reports and Update the Projects with the New Resource Pools

After building the two reports:

  1. Run the first report, and make a note of the Job Roles needed for each project (in the Job Roles in Legacy Pools column).
  2. Run the second report, and see which Resource Pool contains the Job Roles you noted down from the first report (in the Primary Roles of the Resource Pools Users column).
    Make a note of the Resource Pool in the second report.
  3. Navigate back to the first report, and assign this Resource Pool to the project.
    For more information about how to associate Resource Pools with projects, see  Associating Pools with Projects.
    Your Job Role resources in the Legacy Resource Estimates and Resource Budgeting section of each project should now match.

***

New article, make live for the deprecation of RM flash tools. Updated - June 6

IMPORTANT: before you make this public: see if there is an automatic way to migrate this - this was still mentioned in this file, as of July 18: https://docs.google.com/document/d/1zUjQmh3aP1C8U9TpkuUW7HfJkBdOvVnA6EOxFTeZMTM/edit?ts=5b4e6c37 

This article last updated on 2018-08-09 18:22:28 UTC